Home/Construction/Home Additions
CONSTRUCTION · Long Island · Since 1989

Dormers, second stories & bump-outs — designed, engineered & built under one roof.

Primary-suite additions, kitchen bump-outs, family-room additions, shed dormers, full second stories, and attached in-law suites. Our in-house engineer seals the structural plans and the same PM walks the project from first measure through final CO.

Typical timeline
12–24 weeks
Your quote
Free & in writing
Response
24–48 hrs
Home addition framing and spray foam insulation — Levittown, NY
PhotoHome addition under construction · Levittown, NY
NY LIC #H0309970000 Fully Insured Free Written Estimates 10% Senior & Military

Types of additions.

  • Bump-outs (50–250 sq ft) — kitchen expansion, primary-bath addition, dining-room extension
  • Single-room additions (200–500 sq ft) — family room, primary suite, in-law
  • Shed & full dormers — convert cape attics into full second floors
  • Full second stories — double the square footage; we match the roofline
  • Attached ADUs — legal accessory dwelling units where zoning allows

Our design-build process.

Step 1: site visit and wish-list meeting (free). Step 2: preliminary design and budget (free). Step 3: signed design agreement, full construction drawings, and structural engineering (paid, credited toward build). Step 4: permit submission and fixed-price build contract. Step 5: construction with single PM.

What drives the cost of an addition.

No two additions price out the same way, which is why we don't quote from a chart. What moves the number is scope and structure: the footprint you're adding, whether we're building out or building up, the foundation type (full basement, crawl space, or slab), how much of the existing structure and framing has to be re-worked to tie the new space in, and whether the addition needs its own heating, electrical capacity, or plumbing runs. Finish level matters just as much — a bump-out with builder-grade trim and a primary suite with custom millwork and tile are very different projects on identical square footage. Site access, engineering, and the permit and zoning review add to it as well. We price every job individually, after we've walked the property and seen what's actually there. Call (631) 983-8079 and we'll come out, measure, and put a free written quote in your hands within 24–48 hours.

Permits, engineering & CO.

Every addition requires a building permit, a zoning review (FAR, setbacks, height), and eventually a Certificate of Occupancy. We handle every step — zoning variances if needed (rare), plan-check responses, rough and final inspections, and the CO itself. Your job isn't done until the CO is on the wall.

Serving these Long Island towns

Frequently asked about home additions

Design and permitting: 8–16 weeks. Construction: 12–20 weeks depending on size. Budget 9–12 months from first meeting to move-in for a typical single-story addition.
Usually not — most additions fit within your lot's existing FAR (floor-area ratio) and setback allowances. We check zoning before your design is final. If a variance is needed, we can recommend a local zoning attorney.
Yes, for most additions. We isolate the construction zone with temporary framed walls and plastic and keep the rest of your home functional. Full second stories require you to move out for roughly 4–6 weeks.
Primary-suite additions and kitchen bump-outs in Suffolk County typically recoup 70–85% at resale. Full second stories on undersized homes can recoup 90%+ in desirable towns. Your realtor can speak to your specific neighborhood.
Ready to get started?

Get a free, no-pressure quote this week.

(631) 983-8079Email us