Kitchen remodels that finish — on schedule, on budget, with one PM from start to finish.

Full gut remodels, cabinet-and-counter refreshes, layout changes with wall removals, and kitchen expansions. From cabinet design to final walkthrough, one project manager coordinates every trade so your 10-week kitchen doesn't become a 20-week kitchen.

Typical timeline
8–14 weeks
Pricing
Free written quote
Response
24–48 hrs
Kitchen remodel by Just Enterprise One Corp. — Long Island, NY
PhotoKitchen remodel · Long Island, NY
NY LIC #H0309970000 Fully Insured Free Written Estimates 10% Senior & Military

What a full kitchen remodel includes.

  • Design with 3D renderings before demo — you see the kitchen before we build it
  • Permits & inspections for any structural, electrical, or plumbing changes
  • Demo & disposal
  • Structural (wall removals, LVL beams, ceiling patches)
  • Rough electrical and plumbing (relocate outlets, gas, recessed lighting)
  • Drywall, skim-coat, prime, paint
  • Flooring (hardwood, tile, or LVP)
  • Cabinet installation with scribed fillers and shimmed plumb
  • Countertop template & install
  • Tile backsplash, range hood, final plumbing & electrical trim
  • Appliance install & start-up
  • Punch list & walkthrough

How long a real kitchen takes.

There are 12+ trades on a full kitchen, and the critical path is cabinets. We order cabinets the day you sign (6–10 weeks lead time), demo while they build, and stage rough work so the second the cabinets arrive we install. A kitchen should finish 2–3 weeks after cabinet delivery — not 8.

Kitchen expansions.

Removing a wall to open the kitchen to the dining room or family room is the single highest-impact remodel change. Our in-house engineer sizes the LVL beam, we pull the structural permit, and the ceiling patches back in cleanly.

What drives the cost of a kitchen.

Two kitchens the same size can land nowhere near each other, and it's almost never the square footage doing it. The biggest swing is the cabinetry — stock boxes, semi-custom, or full custom, and how many of them. After that: whether the layout stays put or moves. Keeping sink, range, and refrigerator in their existing spots is a very different job from relocating plumbing and gas across the room, and relocating drain lines in a slab or over a finished ceiling is different again.

The rest of the list is the usual suspects: countertop material and how many seams and cutouts it needs; whether a load-bearing wall is coming out and an LVL beam is going in; whether the panel has capacity for new circuits and dedicated appliance runs or needs an upgrade; the condition of what's behind the old cabinets once demo opens it up (rot, old knob-and-tube, out-of-plumb framing); flooring choice; and how much of the work needs permits and inspections. We don't quote kitchens off a per-foot number, because that number would be wrong for your house.

What we do instead: walk the kitchen, measure it, look at the panel and the framing, go through your selections with you, and put a free written quote in your hands within 24–48 hours — itemized, so you can see exactly what each decision is costing you and change your mind before anything is ordered. Call (631) 983-8079 to set up the visit. Seniors and military get 10% off.

Serving these Long Island towns

Frequently asked about kitchen remodeling

Typically 8–12 weeks. We'll set up a temporary kitchen in your dining room or basement — microwave, mini-fridge, hotplate, utensils — on day one of demo. Most clients do fine with that setup for the duration.
Yes — about 90% of our kitchen clients do. We seal off the work area with plastic barriers and zipper doors, and run HEPA air scrubbers during dusty phases. Expect noise from 7am–4pm on workdays.
Our lead designer will take your wish list, measure, and produce 3D renderings and full cabinet plans at no charge if you sign a build contract. For high-end custom work we'll also partner with outside kitchen designers.
Cabinet lead times and client decision changes after ordering. We lock all selections before ordering, so there are no reflows mid-job. Material lead times we can't control, but we plan the schedule around them.